

Generic 30M HDMI Cable v1.4 | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated
- Brand:
- Intel
- Color:
- black
Price at 1 store
1 listing
Cheapest at Noon · see the offer
Average across stores: EGP 1,755.00Prices checked 18h ago
Go to NoonCompare 1 store
Cheapest first. Each price is the store's own, in its own currency.
- EGP 1,755.00Go to NoonNoonBest deal
Generic 30M HDMI Cable v1.4 | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated
Color: blackIn stock · 5 leftChecked 18h ago
Should you buy now?
Sign in to see whether now is a good time to buy
Pricelens compares this price with the history we recorded ourselves and tells you whether to buy or wait. Free with an account.
Price history
- 52-week low
- EGP 1,755.00
- 52-week high
- EGP 1,755.00
- All-time low
- EGP 1,755.00
- All-time high
- EGP 1,755.00
Share this price
Send the price, not just the product.
How much is Generic 30M HDMI Cable v1.4 | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated in Egypt?
The cheapest price for Generic 30M HDMI Cable v1.4 | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated in Egypt today is EGP 1,755 at Noon. The lowest price we recorded in the last 52 weeks is EGP 1,755, the highest EGP 1,755. Sold now by: Noon. We check every store several times a day, and each price links to the store’s own page.
- Brand:
- Intel
Similar products
Smartphones

Intel
30M HDMI Cable v1.4 High Speed with Ethernet ARC 3D, Full HD 1080P, Black with Gold Plated Connectors
FromEGP 632.00
At 1 store






Intel
High Speed HDMI Cable with Ethernet HEC ARC 3D 4K@60Hz UHD 18 Gbps Bandwidth HDMI Male to Male 3m - Black
FromEGP 742.00
At 1 store